DRV8307EVM

Mfr. #: DRV8307EVM
製造商: Texas Instruments
描述: EVAL BOARD MOTOR DRIVER DRV8307
生命週期: 製造商新產品
數據表: DRV8307EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8307EVM Overview

Product belongs to the DRV8307 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8307 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Brushless DC (BLDC) Motors IC package type: DRV8307 Output voltage: 5 V This product is an Solution for evaluating the DRV8307 a brushless DC motor controller. This tool is designed for the DRV8307. Input Voltage Range: 8.5 V Output current: 30 mA

DRV8307EVM Image

DRV8307EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8307EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8307
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8307
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV8307
  • Output-Voltage 5 V
  • Description-Function Solution for evaluating the DRV8307 a brushless DC motor controller
  • Tool-Is-For-Evaluation-Of DRV8307
  • Input-Voltage 8.5 V
  • Output-Current 30 mA

DRV8307EVM

DRV8307EVM Specifications

DRV8307EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DRV8307.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV8307.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Brushless DC (BLDC) Motors

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8307.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 5 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Solution for evaluating the DRV8307 a brushless DC motor controller.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8307

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 8.5 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 30 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$86.85
US$86.85
10
US$82.51
US$825.08
100
US$78.16
US$7 816.50
500
US$73.82
US$36 911.25
1000
US$69.48
US$69 480.00
Top