DRV8804EVM

Mfr. #: DRV8804EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DRV8804
生命週期: 製造商新產品
數據表: DRV8804EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8804EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: 4 Channel Low-Side Driver IC package type: DRV8804 Maximum operating temperature of + 85 C This tool is designed for the DRV8804. USB interface type

DRV8804EVM Image

DRV8804EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8804EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes 4 Channel Low-Side Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8804
  • Maximum-Operating-Temperature + 85 C
  • Tool-Is-For-Evaluation-Of DRV8804
  • Interface-Type USB

DRV8804EVM

DRV8804EVM Specifications

DRV8804EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control, Stepper.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 4 Channel Low-Side Driver.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8804

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8804.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top