DRV8832EVM

Mfr. #: DRV8832EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DRV8832
生命週期: 製造商新產品
數據表: DRV8832EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8832EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized Bulk is the packaging method for this product The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver, 1A IC package type: DRV8832 This tool is designed for the DRV8832. Parrallel interface type Output current: 1 A

DRV8832EVM Image

DRV8832EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8832EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Single-H-Bridge Driver, 1A
  • Embedded No
  • Utilized-IC-Part DRV8832
  • Tool-Is-For-Evaluation-Of DRV8832
  • Interface-Type Parrallel
  • Output-Current 1 A

DRV8832EVM

DRV8832EVM Specifications

DRV8832EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Single-H-Bridge Driver, 1A.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8832.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8832

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is Parrallel.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 1 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top