DRV8833EVM

Mfr. #: DRV8833EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DRV8833
生命週期: 製造商新產品
數據表: DRV8833EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8833EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: Stepper or Single/Dual Brushed DC Motor, 2A Peek IC package type: DRV8833 This tool is designed for the DRV8833. Output current: 1.5 A

DRV8833EVM Image

DRV8833EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8833EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes Stepper or Single/Dual Brushed DC Motor, 2A Peek
  • Embedded No
  • Utilized-IC-Part DRV8833
  • Tool-Is-For-Evaluation-Of DRV8833
  • Output-Current 1.5 A

DRV8833EVM

DRV8833EVM Specifications

DRV8833EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control, Stepper

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Stepper or Single/Dual Brushed DC Motor, 2A Peek.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8833.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8833

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 1.5 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top