DRV8860EVM

Mfr. #: DRV8860EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR DRV8860
生命週期: 製造商新產品
數據表: DRV8860EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8860EVM Overview

Product belongs to the DRV8860 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed MSP430F2350 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV8860 Output voltage: - This product is an Evaluation module for octal low side driver with serial interface. This tool is designed for the DRV8860. Serial UART USB interface type Our product measures 101 mm x 60 mm in dimensions for compact and convenient use. Input Voltage Range: 8 V to 38 V

DRV8860EVM Image

DRV8860EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8860EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8860
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With MSP430F2350
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8860
  • Output-Voltage -
  • Description-Function Evaluation module for octal low side driver with serial interface
  • Tool-Is-For-Evaluation-Of DRV8860
  • Interface-Type Serial UART USB
  • Dimensions 101 mm x 60 mm
  • Input-Voltage 8 V to 38 V

DRV8860EVM

DRV8860EVM Specifications

DRV8860EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DRV8860

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed MSP430F2350

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8860.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is -.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation module for octal low side driver with serial interface

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8860.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is Serial UART USB.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 101 mm x 60 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 8 V to 38 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$114.63
US$114.63
10
US$108.90
US$1 088.98
100
US$103.17
US$10 316.70
500
US$97.44
US$48 717.75
1000
US$91.70
US$91 704.00
Top