FDC1004EVM

Mfr. #: FDC1004EVM
製造商: Texas Instruments
描述: Sensor Development Tools Touch Sensor Development Tools FDC1004 Eval Mod
生命週期: 製造商新產品
數據表: FDC1004EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
FDC1004EVM Overview

Product belongs to the FDC1004 series. This product is categorized as Evaluation Kits Type: Capacitive Touch Proximity Sensors Bulk is the packaging method for this product Sensitivity: - Interface: - Voltage Supply Range: 5V, USB Touch, Capacitive Sensing range of 2 Buttons/Keys Included item: Board. IC package type: FDC1004 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the FDC1004. I2C interface type

FDC1004EVM Image

FDC1004EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

FDC1004EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series FDC1004
  • Product Evaluation Kits
  • Type Capacitive Touch Proximity Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface -
  • Voltage-Supply 5V, USB
  • Sensor-Type Touch, Capacitive
  • Sensing-Range 2 Buttons/Keys
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part FDC1004
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of FDC1004
  • Interface-Type I2C

FDC1004EVM

FDC1004EVM Specifications

FDC1004EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is FDC1004.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is Capacitive Touch Proximity Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: At what frequency does the Interface?

    Q: The product Interface is -.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 5V, USB

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Touch, Capacitive.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed 2 Buttons/Keys

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is FDC1004.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is FDC1004.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$43.50
US$43.50
10
US$41.32
US$413.25
100
US$39.15
US$3 915.00
500
US$36.98
US$18 487.50
1000
US$34.80
US$34 800.00
Top