INA149EVM

Mfr. #: INA149EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR INA149
生命週期: 製造商新產品
數據表: INA149EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA149EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C Output-Type: - Voltage supply range: 4 V ~ 36 V, ±2 V ~ 18 V The 500kHz The 5 V/μs. Current-Output-Channel is 25mA The amplifier is of Differential type. Included item: Board. IC package type: INA149 Board type: Fully Populated. The product has 1 - Single channel per IC. This product is an Evaluation Module. This tool is designed for the INA149.

INA149EVM Image

INA149EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA149EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • Operating-Temperature -40°C ~ 125°C
  • Output-Type -
  • Voltage-Supply-Single-Dual 4 V ~ 36 V, ±2 V ~ 18 V
  • -3db-Bandwidth 500kHz
  • Slew-Rate 5 V/μs
  • Current-Output-Channel 25mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part INA149
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 810μA
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of INA149

INA149EVM

INA149EVM Specifications

INA149EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 125°C.

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is -.

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed 4 V ~ 36 V, ±2 V ~ 18 V

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 500kHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 5 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 25mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Differential.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed INA149

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 1 - Single

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation Module.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed INA149

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top