LDC1312EVM

Mfr. #: LDC1312EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR LDC1312
生命週期: 製造商新產品
數據表: LDC1312EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDC1312EVM Overview

Product belongs to the LDC1312 series. This product is categorized as Evaluation Modules Type: Inductance to Digital Bulk is the packaging method for this product Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1312 This tool is designed for the LCD1312.

LDC1312EVM Image

LDC1312EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1312EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LDC1312
  • Product Evaluation Modules
  • Type Inductance to Digital
  • Packaging Bulk
  • Sensitivity -
  • Interface USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Proximity, Inductive
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LDC1312
  • Tool-Is-For-Evaluation-Of LCD1312

LDC1312EVM

LDC1312EVM Specifications

LDC1312EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LDC1312.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Inductance to Digital.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is -.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed USB

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 5V, USB.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Proximity, Inductive

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LDC1312

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LCD1312.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$33.57
US$33.57
10
US$31.89
US$318.92
100
US$30.21
US$3 021.30
500
US$28.53
US$14 267.25
1000
US$26.86
US$26 856.00
Top