LDC1612EVM

Mfr. #: LDC1612EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR LDC1612
生命週期: 製造商新產品
數據表: LDC1612EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDC1612EVM Overview

Product belongs to the LDC1612 series. This product is categorized as Evaluation Modules Type: Inductance to Digital Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1612 This tool is designed for the LDC1612.

LDC1612EVM Image

LDC1612EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1612EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LDC1612
  • Product Evaluation Modules
  • Type Inductance to Digital
  • Sensitivity -
  • Interface USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Proximity, Inductive
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LDC1612
  • Tool-Is-For-Evaluation-Of LDC1612

LDC1612EVM

LDC1612EVM Specifications

LDC1612EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LDC1612.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Inductance to Digital.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed -

  • A: At what frequency does the Interface?

    Q: The product Interface is USB.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 5V, USB

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Proximity, Inductive.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LDC1612.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LDC1612.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$33.57
US$33.57
10
US$31.89
US$318.92
100
US$30.21
US$3 021.30
500
US$28.53
US$14 267.25
1000
US$26.86
US$26 856.00
Top