LM57EVM

Mfr. #: LM57EVM
製造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools LM57 EVAL MOD
生命週期: 製造商新產品
數據表: LM57EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM57EVM Overview

Product belongs to the LM57 series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1.5°C Interface: Analog Voltage Supply Range: 2.4 V ~ 5.5 V Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LM57 This tool is designed for the LM57.

LM57EVM Image

LM57EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM57EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LM57
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±1.5°C
  • Interface Analog
  • Voltage-Supply 2.4 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -50°C ~ 150°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part LM57
  • Tool-Is-For-Evaluation-Of LM57

LM57EVM

LM57EVM Specifications

LM57EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LM57

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Temperature Sensors

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±1.5°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is Analog.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 2.4 V ~ 5.5 V

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -50°C ~ 150°C.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LM57.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LM57.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$43.50
US$43.50
10
US$41.32
US$413.25
100
US$39.15
US$3 915.00
500
US$36.98
US$18 487.50
1000
US$34.80
US$34 800.00
Top