LMT84-7EVM

Mfr. #: LMT84-7EVM
製造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools LMT84-7EVM Temp Sensor EVM
生命週期: 製造商新產品
數據表: LMT84-7EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMT84-7EVM Overview

Product belongs to the LMT84 series. This product is categorized as Evaluation Boards Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: - Interface: Analog Voltage Supply Range: - Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LMT84, LMT85, LMT86, LMT87 Maximum operating temperature of + 150 C Minimum operating temperature: - 50 C This product operates at a 1.5 V to 5.5 V supply voltage for reliable performance. This tool is designed for the LMT84 LMT85 LMT86 LMT87.

LMT84-7EVM Image

LMT84-7EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT84-7EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LMT84
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface Analog
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -50°C ~ 150°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part LMT84, LMT85, LMT86, LMT87
  • Maximum-Operating-Temperature + 150 C
  • Minimum-Operating-Temperature - 50 C
  • Operating-Supply-Voltage 1.5 V to 5.5 V
  • Tool-Is-For-Evaluation-Of LMT84 LMT85 LMT86 LMT87

LMT84-7EVM

LMT84-7EVM Specifications

LMT84-7EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LMT84

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed -

  • A: What is the Interface of the product?

    Q: The Interface of the product is Analog.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -50°C ~ 150°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LMT84, LMT85, LMT86, LMT87

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 150 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 50 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.5 V to 5.5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LMT84 LMT85 LMT86 LMT87

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$33.57
US$33.57
10
US$31.89
US$318.92
100
US$30.21
US$3 021.30
500
US$28.53
US$14 267.25
1000
US$26.86
US$26 856.00
Top