LP5562EVM

Mfr. #: LP5562EVM
製造商: Texas Instruments
描述: LED Lighting Development Tools LP5562 EVAL MOD
生命週期: 製造商新產品
數據表: LP5562EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP5562EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed LP5562 amplifier. 2.7 V ~ 5.5 V voltage input Current-Output-Channel is - Output voltage: - Included item: Board, Cable. IC package type: LP5562 The product has - outputs. This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. Processor Core: LP5562

LP5562EVM Image

LP5562EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5562EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series -
  • Product Evaluation Modules
  • Packaging Bulk
  • For-Use-With LP5562
  • Features Programmable
  • Voltage-Input 2.7 V ~ 5.5 V
  • Current-Output-Channel -
  • Voltage-Output -
  • Supplied-Contents Board, Cable
  • Utilized-IC-Part LP5562
  • Outputs-and-Type -
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Core LP5562

LP5562EVM

LP5562EVM Specifications

LP5562EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is LP5562.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 2.7 V ~ 5.5 V.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is -.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board, Cable.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LP5562.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is -.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.7 V to 5.5 V.

  • A: What is the Core of the product?

    Q: The Core of the product is LP5562.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$86.85
US$86.85
10
US$82.51
US$825.08
100
US$78.16
US$7 816.50
500
US$73.82
US$36 911.25
1000
US$69.48
US$69 480.00
Top