REG710EVM-33

Mfr. #: REG710EVM-33
製造商: Texas Instruments
描述: EVAL MOD FOR REG710-XX
生命週期: 製造商新產品
數據表: REG710EVM-33 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
REG710EVM-33 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Charge Pumps The DC/DC, Step Up or Down is the Main-Purpose. 1.8 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 1MHz for optimal performance. Output voltage: 3.3V Buck-Boost regulator topology - Included item: Board. IC package type: REG710 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the REG710. Our product measures 50.8 mm x 50.8 mm in dimensions for compact and convenient use. Input Voltage Range: 1.8 V to 5.5 V

REG710EVM-33 Image

REG710EVM-33

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

REG710EVM-33 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Charge Pumps
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 1.8 V ~ 5.5 V
  • Frequency-Switching 1MHz
  • Current-Output 30mA
  • Voltage-Output 3.3V
  • Regulator-Topology Buck-Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part REG710
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of REG710
  • Dimensions 50.8 mm x 50.8 mm
  • Input-Voltage 1.8 V to 5.5 V

REG710EVM-33

REG710EVM-33 Specifications

REG710EVM-33 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Charge Pumps.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Up or Down.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 1.8 V ~ 5.5 V.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is 1MHz.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 3.3V

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck-Boost

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is REG710.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is REG710.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 50.8 mm x 50.8 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 1.8 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top