RF430F5978EVM

Mfr. #: RF430F5978EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR RF430F5987
生命週期: 製造商新產品
數據表: RF430F5978EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
RF430F5978EVM Overview

Compatible with RF430F5978. Product belongs to the RF430F5978 series. This product is categorized as Evaluation Kits Type: Transceiver Bulk is the packaging method for this product This product is designed TPS62163 TPS62082 amplifier. This product's 300MHz ~ 950MHz range is 0Hz to 2.2GHz. Included item: 3 Boards. This product operates at a 2.1 V to 3 V supply voltage for reliable performance. This product is an Sub 1 GHz transceiver LF wake receiver/transponder SoC. This tool is designed for the RF430F5978. USB interface type

RF430F5978EVM Image

RF430F5978EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

RF430F5978EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products RF430F5978
  • Series RF430F5978
  • Product Evaluation Kits
  • Type Transceiver
  • Packaging Bulk
  • For-Use-With TPS62163 TPS62082
  • Frequency 300MHz ~ 950MHz
  • Supplied-Contents 3 Boards
  • Operating-Supply-Voltage 2.1 V to 3 V
  • Description-Function Sub 1 GHz transceiver LF wake receiver/transponder SoC
  • Tool-Is-For-Evaluation-Of RF430F5978
  • Interface-Type USB

RF430F5978EVM

RF430F5978EVM Specifications

RF430F5978EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed RF430F5978

  • A: At what frequency does the Series?

    Q: The product Series is RF430F5978.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Transceiver

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TPS62163 TPS62082.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 300MHz ~ 950MHz

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 3 Boards

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.1 V to 3 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Sub 1 GHz transceiver LF wake receiver/transponder SoC

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed RF430F5978

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$435.00
US$435.00
10
US$413.25
US$4 132.50
100
US$391.50
US$39 150.00
500
US$369.75
US$184 875.00
1000
US$348.00
US$348 000.00
Top