TAS5631DKD2EVM

Mfr. #: TAS5631DKD2EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR TAS5631DKD2
生命週期: 製造商新產品
數據表: TAS5631DKD2EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TAS5631DKD2EVM Overview

Product belongs to the PurePath HD series. Output-Type: 1-Channel (Mono) or 2-Channel (Stereo) Voltage Supply Range: 25 V ~ 52.5 V Maximum Output Power of 600W x 1 @ 2 Ohm; 300W x 2 @ 4 Ohm for 1 channel The amplifier is of Class D type. Included item: Board, Cable, Power Supply. IC package type: TAS5631 Board type: Fully Populated.

TAS5631DKD2EVM Image

TAS5631DKD2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TAS5631DKD2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series PurePath HD
  • Output-Type 1-Channel (Mono) or 2-Channel (Stereo)
  • Voltage-Supply 25 V ~ 52.5 V
  • Max-Output-Power-x-Channels-Load 600W x 1 @ 2 Ohm; 300W x 2 @ 4 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board, Cable, Power Supply
  • Utilized-IC-Part TAS5631
  • Board-Type Fully Populated

TAS5631DKD2EVM

TAS5631DKD2EVM Specifications

TAS5631DKD2EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is PurePath HD.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed 1-Channel (Mono) or 2-Channel (Stereo)

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 25 V ~ 52.5 V.

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is 600W x 1 @ 2 Ohm; 300W x 2 @ 4 Ohm.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class D.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board, Cable, Power Supply

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TAS5631.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top