THS6002EVM

Mfr. #: THS6002EVM
製造商: Texas Instruments
描述: EVAL MOD FOR THS6002
生命週期: 製造商新產品
數據表: THS6002EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS6002EVM Overview

Product belongs to the - series. The Interface, Line Driver, ADSL is the Main-Purpose. Primary-Attributes: - IC package type: THS6002

THS6002EVM Image

THS6002EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS6002EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Line Driver, ADSL
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part THS6002

THS6002EVM

THS6002EVM Specifications

THS6002EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Line Driver, ADSL.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS6002

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top