| Mfr. #: | TLC3548EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | EVALUATION MODULE FOR TLC3548 |
| 生命週期: | 製造商新產品 |
| 數據表: | TLC3548EVM 數據表 |


Product belongs to the - series. This product's 200k. Data-Interface: Serial 14 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: TLC3548

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLC3548EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 200k.
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed Serial
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 14.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 0 ~ 5 V.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TLC3548.