TLK10002EVM

Mfr. #: TLK10002EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR TLK10002
生命週期: 製造商新產品
數據表: TLK10002EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK10002EVM Overview

Product belongs to the - series. The Interface, Transceiver is the Main-Purpose. Primary-Attributes: Dual Channel 0.5 ~ 10Gbps SerDes IC package type: TLK10002

TLK10002EVM Image

TLK10002EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK10002EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Transceiver
  • Primary-Attributes Dual Channel 0.5 ~ 10Gbps SerDes
  • Embedded No
  • Utilized-IC-Part TLK10002

TLK10002EVM

TLK10002EVM Specifications

TLK10002EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Transceiver.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Dual Channel 0.5 ~ 10Gbps SerDes

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TLK10002.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$3.00
US$3.00
10
US$3.00
US$30.00
100
US$3.00
US$300.00
500
US$3.00
US$1 500.00
1000
US$3.00
US$3 000.00
Top