TLK1501EVM

Mfr. #: TLK1501EVM
製造商: Texas Instruments
描述: EVALUATION MOD FOR TLK1501
生命週期: 製造商新產品
數據表: TLK1501EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK1501EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Serializers / Deserializers The Interface, Serializer, Deserializer (SerDes) is the Main-Purpose. Primary-Attributes: - IC package type: TLK1501 This product is an TLK1501 - Interface. This tool is designed for the TLK1501.

TLK1501EVM Image

TLK1501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK1501EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Serializers / Deserializers
  • Main-Purpose Interface, Serializer, Deserializer (SerDes)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TLK1501
  • Description-Function TLK1501 - Interface
  • Tool-Is-For-Evaluation-Of TLK1501

TLK1501EVM

TLK1501EVM Specifications

TLK1501EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Serializers / Deserializers.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Serializer, Deserializer (SerDes).

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TLK1501

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TLK1501 - Interface.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TLK1501.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$925.17
US$925.17
10
US$878.91
US$8 789.12
100
US$832.65
US$83 265.30
500
US$786.39
US$393 197.25
1000
US$740.14
US$740 136.00
Top