TLK2201EVM

Mfr. #: TLK2201EVM
製造商: Texas Instruments
描述: EVALUATION MOD FOR TLK2201
生命週期: 製造商新產品
數據表: TLK2201EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK2201EVM Overview

Product belongs to the - series. The Interface, Serializer, Deserializer (SerDes) is the Main-Purpose. Primary-Attributes: - IC package type: TLK2201

TLK2201EVM Image

TLK2201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK2201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Serializer, Deserializer (SerDes)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TLK2201

TLK2201EVM

TLK2201EVM Specifications

TLK2201EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Serializer, Deserializer (SerDes)

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TLK2201.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$925.17
US$925.17
10
US$878.91
US$8 789.12
100
US$832.65
US$83 265.30
500
US$786.39
US$393 197.25
1000
US$740.14
US$740 136.00
Top