TLK2501EVM

Mfr. #: TLK2501EVM
製造商: Texas Instruments
描述: EVALUATON MOD FOR TLK2501
生命週期: 製造商新產品
數據表: TLK2501EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK2501EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Serializers / Deserializers The Interface, Serializer, Deserializer (SerDes) is the Main-Purpose. Primary-Attributes: - IC package type: TLK2501 This product is an TLK2501 - Interface. This tool is designed for the TLK2501.

TLK2501EVM Image

TLK2501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK2501EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Serializers / Deserializers
  • Main-Purpose Interface, Serializer, Deserializer (SerDes)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TLK2501
  • Description-Function TLK2501 - Interface
  • Tool-Is-For-Evaluation-Of TLK2501

TLK2501EVM

TLK2501EVM Specifications

TLK2501EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Serializers / Deserializers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Serializer, Deserializer (SerDes)

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TLK2501

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TLK2501 - Interface.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TLK2501

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$1.00
US$1.00
10
US$1.00
US$10.00
100
US$1.00
US$100.00
500
US$1.00
US$500.00
1000
US$958.80
US$958 800.00
Top