TMP100EVM

Mfr. #: TMP100EVM
製造商: Texas Instruments
描述: EVALUATION MODULE FOR TMP100
生命週期: 製造商新產品
數據表: TMP100EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP100EVM Overview

Product belongs to the - series. Sensitivity: ±0.5°C Interface: I2C, SMBus Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 125°C Included item: Board. IC package type: TMP100

TMP100EVM Image

TMP100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Sensitivity ±0.5°C
  • Interface I2C, SMBus
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -55°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP100

TMP100EVM

TMP100EVM Specifications

TMP100EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±0.5°C

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C, SMBus

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 2.7 V ~ 5.5 V

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -55°C ~ 125°C

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP100.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$96.70
US$96.70
10
US$91.87
US$918.70
100
US$87.03
US$8 703.45
500
US$82.20
US$41 099.65
1000
US$77.36
US$77 364.00
Top