TMP108EVM

Mfr. #: TMP108EVM
製造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools TMP108 EVAL MOD
生命週期: 製造商新產品
數據表: TMP108EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP108EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Sensitivity: ±1°C Interface: I2C, SMBus, USB Voltage Supply Range: 1.4 V ~ 3.6 V Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP108 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP108. I2C USB interface type

TMP108EVM Image

TMP108EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Sensitivity ±1°C
  • Interface I2C, SMBus, USB
  • Voltage-Supply 1.4 V ~ 3.6 V
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded -
  • Utilized-IC-Part TMP108
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TMP108
  • Interface-Type I2C USB

TMP108EVM

TMP108EVM Specifications

TMP108EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±1°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is I2C, SMBus, USB.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 1.4 V ~ 3.6 V

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -40°C ~ 125°C

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP108

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 125 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TMP108.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$112.50
US$112.50
10
US$106.88
US$1 068.75
100
US$101.25
US$10 125.00
500
US$95.62
US$47 812.50
1000
US$90.00
US$90 000.00
Top