TMP451EVM

Mfr. #: TMP451EVM
製造商: Texas Instruments
描述: Sensor Development Tools Temperature Sensor Development Tools TMP451 EVAL MOD
生命週期: 製造商新產品
數據表: TMP451EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP451EVM Overview

Product belongs to the TMP451 series. This product is categorized as Evaluation Modules Type: Temperature Sensors Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards, Cables. IC package type: TMP451 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP451. I2C SPI interface type

TMP451EVM Image

TMP451EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP451EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP451
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Sensitivity ±1°C
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cables
  • Embedded -
  • Utilized-IC-Part TMP451
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TMP451
  • Interface-Type I2C SPI

TMP451EVM

TMP451EVM Specifications

TMP451EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TMP451.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed ±1°C

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Temperature

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards, Cables.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP451

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP451.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$86.85
US$86.85
10
US$82.51
US$825.08
100
US$78.16
US$7 816.50
500
US$73.82
US$36 911.25
1000
US$69.48
US$69 480.00
Top