TPL0501EVM

Mfr. #: TPL0501EVM
製造商: Texas Instruments
描述: LED Lighting Development Tools TPL0501 EVAL MOD
生命週期: 製造商新產品
數據表: TPL0501EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPL0501EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product This product is designed TPL0501 amplifier. The Digital Potentiometer is the Main-Purpose. Primary-Attributes: 1 Channel, 256 Position IC package type: TPL0501 This product operates at a 5.5 V supply voltage for reliable performance.

TPL0501EVM Image

TPL0501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPL0501EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • For-Use-With TPL0501
  • Main-Purpose Digital Potentiometer
  • Primary-Attributes 1 Channel, 256 Position
  • Embedded No
  • Utilized-IC-Part TPL0501
  • Operating-Supply-Voltage 5.5 V

TPL0501EVM

TPL0501EVM Specifications

TPL0501EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TPL0501.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Digital Potentiometer

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 1 Channel, 256 Position.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPL0501

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$30.00
US$30.00
10
US$28.50
US$285.00
100
US$27.00
US$2 700.00
500
US$25.50
US$12 750.00
1000
US$24.00
US$24 000.00
Top