TPL5100EVM

Mfr. #: TPL5100EVM
製造商: Texas Instruments
描述: EVALUATION MODULE FOR TPL5100
生命週期: 製造商新產品
數據表: TPL5100EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPL5100EVM Overview

Product belongs to the TPL5100 series. This product is categorized as Evaluation Boards Type: Clock and Data Retiming Bulk is the packaging method for this product This product is designed C2000 MSP430 Stellaris amplifier. The Timing, Timer is the Main-Purpose. Primary-Attributes: Watchdog Timer IC package type: TPL5100 This product is an Allows designers to configure delay timers on the TPL5100 and measure very low current consumption. This tool is designed for the TPL5100.

TPL5100EVM Image

TPL5100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPL5100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TPL5100
  • Product Evaluation Boards
  • Type Clock and Data Retiming
  • Packaging Bulk
  • For-Use-With C2000 MSP430 Stellaris
  • Main-Purpose Timing, Timer
  • Primary-Attributes Watchdog Timer
  • Embedded No
  • Utilized-IC-Part TPL5100
  • Description-Function Allows designers to configure delay timers on the TPL5100 and measure very low current consumption
  • Tool-Is-For-Evaluation-Of TPL5100

TPL5100EVM

TPL5100EVM Specifications

TPL5100EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TPL5100.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock and Data Retiming

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is C2000 MSP430 Stellaris.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Timer

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Watchdog Timer

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPL5100.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Allows designers to configure delay timers on the TPL5100 and measure very low current consumption.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPL5100.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$23.14
US$23.14
10
US$21.99
US$219.88
100
US$20.83
US$2 083.05
500
US$19.67
US$9 836.65
1000
US$18.52
US$18 516.00
Top