TPS2071EVM-159

Mfr. #: TPS2071EVM-159
製造商: Texas Instruments
描述: EVAL MOD FOR TPS2071
生命週期: 製造商新產品
數據表: TPS2071EVM-159 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2071EVM-159 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Distributions Bulk is the packaging method for this product The Interface, USB 2.0 Hub is the Main-Purpose. Primary-Attributes: - IC package type: TPS2071 Output voltage: 5 V This product is an TPS2071 hybrid USB hub evaluation module. This tool is designed for the TPS2071. USB interface type Input Voltage Range: 4.75 V to 5.25 V 4.85 V to 5.15 V Output current: 2 A

TPS2071EVM-159 Image

TPS2071EVM-159

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2071EVM-159 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Distributions
  • Packaging Bulk
  • Main-Purpose Interface, USB 2.0 Hub
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2071
  • Output-Voltage 5 V
  • Description-Function TPS2071 hybrid USB hub evaluation module
  • Tool-Is-For-Evaluation-Of TPS2071
  • Interface-Type USB
  • Input-Voltage 4.75 V to 5.25 V 4.85 V to 5.15 V
  • Output-Current 2 A

TPS2071EVM-159

TPS2071EVM-159 Specifications

TPS2071EVM-159 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Distributions

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, USB 2.0 Hub

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS2071.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 5 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is TPS2071 hybrid USB hub evaluation module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS2071.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 4.75 V to 5.25 V 4.85 V to 5.15 V

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 2 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$148.50
US$148.50
10
US$141.08
US$1 410.75
100
US$133.65
US$13 365.00
500
US$126.22
US$63 112.50
1000
US$118.80
US$118 800.00
Top