TPS2384EVM

Mfr. #: TPS2384EVM
製造商: Texas Instruments
描述: EVALUATION MODULE FOR TPS2384
生命週期: 製造商新產品
數據表: TPS2384EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2384EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Special Purpose DC/DC, Power Over Ethernet is the Main-Purpose. 44 V ~ 57 V voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: - - regulator topology - Included item: Board. IC package type: TPS2384 Board type: Fully Populated. The product has 4, Isolated outputs. This tool is designed for the TPS2384. Ethernet I2C interface type

TPS2384EVM Image

TPS2384EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2384EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Hot Swap Voltage Controllers
  • Main-Purpose Special Purpose DC/DC, Power Over Ethernet
  • Voltage-Input 44 V ~ 57 V
  • Frequency-Switching -
  • Current-Output -
  • Voltage-Output -
  • Regulator-Topology -
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS2384
  • Board-Type Fully Populated
  • Outputs-and-Type 4, Isolated
  • Tool-Is-For-Evaluation-Of TPS2384
  • Interface-Type Ethernet I2C

TPS2384EVM

TPS2384EVM Specifications

TPS2384EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Hot Swap Voltage Controllers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Special Purpose DC/DC, Power Over Ethernet

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 44 V ~ 57 V.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is -.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed -

  • A: At what frequency does the Regulator-Topology?

    Q: The product Regulator-Topology is -.

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS2384.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 4, Isolated.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS2384.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is Ethernet I2C.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top