| Mfr. #: | TPS2390EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | EVAL MOD FOR TPS2390 |
| 生命週期: | 製造商新產品 |
| 數據表: | TPS2390EVM 數據表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2390 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2390. Our product measures 81.9 mm x 56.8 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2390EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Hot Swap Voltage Controllers
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Hot Swap Controller.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed -
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TPS2390.
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TPS2390.
A: At what frequency does the Dimensions?
Q: The product Dimensions is 81.9 mm x 56.8 mm.
A: At what frequency does the Input-Voltage?
Q: The product Input-Voltage is - 48 V.