| Mfr. #: | TPS2392EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR TPS2392 |
| 生命週期: | 製造商新產品 |
| 數據表: | TPS2392EVM 數據表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2392 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2392. Our product measures 119.6 mm x 91.4 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2392EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Hot Swap Voltage Controllers.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Power Management, Hot Swap Controller.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is -.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TPS2392
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 85 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TPS2392.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 119.6 mm x 91.4 mm.
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed - 48 V