| Mfr. #: | TPS2393EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | EVAL MODULE FOR TPS2393 |
| 生命週期: | 製造商新產品 |
| 數據表: | TPS2393EVM 數據表 |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2393 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2393. Our product measures 119.6 mm x 91.4 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2393EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Boards
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Hot Swap Voltage Controllers
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Hot Swap Controller.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed -
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TPS2393.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 85 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TPS2393.
A: Is the cutoff frequency of the product Dimensions?
Q: Yes, the product's Dimensions is indeed 119.6 mm x 91.4 mm
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed - 48 V