TPS2398EVM

Mfr. #: TPS2398EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR TPS2398
生命週期: 製造商新產品
數據表: TPS2398EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2398EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers The Power Management, Hot Swap Controller is the Main-Purpose. Primary-Attributes: - IC package type: TPS2398 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This tool is designed for the TPS2398. Our product measures 81.9 mm x 56.8 mm in dimensions for compact and convenient use. Input Voltage Range: - 48 V

TPS2398EVM Image

TPS2398EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2398EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Hot Swap Voltage Controllers
  • Main-Purpose Power Management, Hot Swap Controller
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2398
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Tool-Is-For-Evaluation-Of TPS2398
  • Dimensions 81.9 mm x 56.8 mm
  • Input-Voltage - 48 V

TPS2398EVM

TPS2398EVM Specifications

TPS2398EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Hot Swap Voltage Controllers

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Hot Swap Controller

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS2398.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS2398

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 81.9 mm x 56.8 mm.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is - 48 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$0.00
US$0.00
10
US$0.00
US$0.00
100
US$0.00
US$0.00
500
US$0.00
US$0.00
1000
US$0.00
US$0.00
Top