TPS563200EVM-652

Mfr. #: TPS563200EVM-652
製造商: Texas Instruments
描述: EVAL BOARD FOR TPS563200
生命週期: 製造商新產品
數據表: TPS563200EVM-652 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS563200EVM-652 Overview

Product belongs to the D-CAP2, Eco-Mode, SWIFT series. This product is categorized as Evaluation Modules Type: Voltage Regulators - Switching Regulators This product is designed TPS563200 amplifier. The DC/DC, Step Down is the Main-Purpose. 4.5 V ~ 17 V voltage input This product features 'Frequency-Switching' at 650kHz for optimal performance. Output voltage: 1.05V Buck regulator topology - Included item: Board. IC package type: TPS563200 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 1.05 V This product is an TPS563200EVM-652 3 A SWIFT regulator evaluation module. This tool is designed for the TPS563200. Input Voltage Range: 4.5 V to 17 V Output current: 0 A to 3 A

TPS563200EVM-652 Image

TPS563200EVM-652

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS563200EVM-652 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series D-CAP2, Eco-Mode, SWIFT
  • Product Evaluation Modules
  • Type Voltage Regulators - Switching Regulators
  • For-Use-With TPS563200
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4.5 V ~ 17 V
  • Frequency-Switching 650kHz
  • Current-Output 3A
  • Voltage-Output 1.05V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS563200
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 1.05 V
  • Description-Function TPS563200EVM-652 3 A SWIFT regulator evaluation module
  • Tool-Is-For-Evaluation-Of TPS563200
  • Input-Voltage 4.5 V to 17 V
  • Output-Current 0 A to 3 A

TPS563200EVM-652

TPS563200EVM-652 Specifications

TPS563200EVM-652 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is D-CAP2, Eco-Mode, SWIFT.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TPS563200.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 4.5 V ~ 17 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 650kHz

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 1.05V.

  • A: At what frequency does the Regulator-Topology?

    Q: The product Regulator-Topology is Buck.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS563200.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 1.05 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TPS563200EVM-652 3 A SWIFT regulator evaluation module.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS563200

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 4.5 V to 17 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 0 A to 3 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$56.74
US$56.74
10
US$53.91
US$539.08
100
US$51.07
US$5 107.05
500
US$48.23
US$24 116.65
1000
US$45.40
US$45 396.00
Top