TPS6735EVM

Mfr. #: TPS6735EVM
製造商: Texas Instruments
描述: EVAL MOD FOR TPS6735
生命週期: 製造商新產品
數據表: TPS6735EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS6735EVM Overview

Product belongs to the - series. The DC/DC, Negative Inverter is the Main-Purpose. 4 V ~ 6.2 V voltage input This product features 'Frequency-Switching' at 160Hz for optimal performance. Output voltage: -5V Inverting regulator topology - Included item: Board. IC package type: TPS6735 Board type: Fully Populated. The product has 1, Non-Isolated outputs.

TPS6735EVM Image

TPS6735EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS6735EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Main-Purpose DC/DC, Negative Inverter
  • Voltage-Input 4 V ~ 6.2 V
  • Frequency-Switching 160Hz
  • Current-Output 200mA
  • Voltage-Output -5V
  • Regulator-Topology Inverting
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS6735
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated

TPS6735EVM

TPS6735EVM Specifications

TPS6735EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed DC/DC, Negative Inverter

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 4 V ~ 6.2 V

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 160Hz

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is -5V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Inverting

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS6735.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$96.70
US$96.70
10
US$91.87
US$918.70
100
US$87.03
US$8 703.45
500
US$82.20
US$41 099.65
1000
US$77.36
US$77 364.00
Top