TPS7B6950EVM

Mfr. #: TPS7B6950EVM
製造商: Texas Instruments
描述: EVALUATION MODULE TPS7B6950
生命週期: 製造商新產品
數據表: TPS7B6950EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS7B6950EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Linear Voltage Regulators Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C 5.5 V ~ 40 V voltage input Output voltage: 5V Included item: Board. IC package type: TPS7B6950-Q1 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Fixed. Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product is an TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module. This tool is designed for the TPS7B6950. Input Voltage Range: 5.5 V to 40 V Output current: 150 mA

TPS7B6950EVM Image

TPS7B6950EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS7B6950EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Linear Voltage Regulators
  • Series -
  • Product Evaluation Modules
  • Type Linear Voltage Regulators
  • Packaging Bulk
  • Operating-Temperature -40°C ~ 125°C
  • Voltage-Input 5.5 V ~ 40 V
  • Current-Output 150mA
  • Voltage-Output 5V
  • Supplied-Contents Board
  • Utilized-IC-Part TPS7B6950-Q1
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Regulator-Type Positive Fixed
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Description-Function TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module
  • Tool-Is-For-Evaluation-Of TPS7B6950
  • Input-Voltage 5.5 V to 40 V
  • Output-Current 150 mA

TPS7B6950EVM

TPS7B6950EVM Specifications

TPS7B6950EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Linear Voltage Regulators.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 125°C.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 5.5 V ~ 40 V.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 5V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS7B6950-Q1.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

  • A: At what frequency does the Regulator-Type?

    Q: The product Regulator-Type is Positive Fixed.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed TPS7B6950QDCYRQ1 low quiescent low dropout evaluation module

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS7B6950.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 5.5 V to 40 V.

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 150 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$73.50
US$73.50
10
US$69.82
US$698.25
100
US$66.15
US$6 615.00
500
US$62.48
US$31 237.50
1000
US$58.80
US$58 800.00
Top