TRF3705EVM

Mfr. #: TRF3705EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR TRF3705
生命週期: 製造商新產品
數據表: TRF3705EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3705EVM Overview

Compatible with TRF3705. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Modulator This product's 300MHz ~ 4GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 0 V to 3.6 V supply voltage for reliable performance. This tool is designed for the TRF3705.

TRF3705EVM Image

TRF3705EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3705EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF3705
  • Series -
  • Product Evaluation Modules
  • Type Modulator
  • Frequency 300MHz ~ 4GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 0 V to 3.6 V
  • Tool-Is-For-Evaluation-Of TRF3705

TRF3705EVM

TRF3705EVM Specifications

TRF3705EVM FAQ
  • A: At what frequency does the For-Use-With-Related-Products?

    Q: The product For-Use-With-Related-Products is TRF3705.

  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Modulator.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 300MHz ~ 4GHz.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 0 V to 3.6 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TRF3705

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$230.43
US$230.43
10
US$218.91
US$2 189.08
100
US$207.39
US$20 738.70
500
US$195.87
US$97 932.75
1000
US$184.34
US$184 344.00
Top