TRF371135EVM

Mfr. #: TRF371135EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR TRF371135
生命週期: 製造商新產品
數據表: TRF371135EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF371135EVM Overview

Compatible with TRF371135. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Demodulator This product's 1.7GHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board, Cable. This product operates at a 5 V supply voltage for reliable performance. This product is an Used to test the performance of the TRF371135 direct quadrature demodulator device. This tool is designed for the TRF371135. USB interface type

TRF371135EVM Image

TRF371135EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF371135EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF371135
  • Series -
  • Product Evaluation Modules
  • Type Demodulator
  • Frequency 1.7GHz ~ 6GHz
  • Supplied-Contents Board, Cable
  • Operating-Supply-Voltage 5 V
  • Description-Function Used to test the performance of the TRF371135 direct quadrature demodulator device
  • Tool-Is-For-Evaluation-Of TRF371135
  • Interface-Type USB

TRF371135EVM

TRF371135EVM Specifications

TRF371135EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF371135.

  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Demodulator.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 1.7GHz ~ 6GHz.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board, Cable.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Used to test the performance of the TRF371135 direct quadrature demodulator device

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TRF371135

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$448.50
US$448.50
10
US$426.08
US$4 260.75
100
US$403.65
US$40 365.00
500
US$381.22
US$190 612.50
1000
US$358.80
US$358 800.00
Top