TRF3722EVM

Mfr. #: TRF3722EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR TRF3722
生命週期: 製造商新產品
數據表: TRF3722EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3722EVM Overview

Compatible with TRF3722. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Modulator Bulk is the packaging method for this product This product is designed TRF3722 amplifier. This product's 400MHz ~ 4.1GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This product is an TRF3722 evaluation module. This tool is designed for the TRF3722.

TRF3722EVM Image

TRF3722EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3722EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF3722
  • Series -
  • Product Evaluation Modules
  • Type Modulator
  • Packaging Bulk
  • For-Use-With TRF3722
  • Frequency 400MHz ~ 4.1GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Description-Function TRF3722 evaluation module
  • Tool-Is-For-Evaluation-Of TRF3722

TRF3722EVM

TRF3722EVM Specifications

TRF3722EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF3722.

  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Modulator.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed TRF3722

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 400MHz ~ 4.1GHz.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is TRF3722 evaluation module.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TRF3722.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$298.50
US$298.50
10
US$283.58
US$2 835.75
100
US$268.65
US$26 865.00
500
US$253.72
US$126 862.50
1000
US$238.80
US$238 800.00
Top