TSC2005EVM

Mfr. #: TSC2005EVM
製造商: Texas Instruments
描述: TSC2005EVM
生命週期: 製造商新產品
數據表: TSC2005EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2005EVM Overview

Product belongs to the - series. The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2005

TSC2005EVM Image

TSC2005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2005

TSC2005EVM

TSC2005EVM Specifications

TSC2005EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Touch Screen Controller.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TSC2005.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$92.08
US$92.08
10
US$87.48
US$874.81
100
US$82.88
US$8 287.65
500
US$78.27
US$39 136.15
1000
US$73.67
US$73 668.00
Top