| Mfr. #: | TSC2007EVM-PDK |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | TSC2007EVM-PDK |
| 生命週期: | 製造商新產品 |
| 數據表: | TSC2007EVM-PDK 數據表 |


Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product This product is designed USB-MODEVM amplifier. Sensitivity: - Interface: I2C Voltage Supply Range: - Touch Screen Sensing range of - Included item: 2 Boards. IC package type: TSC2007 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2007. 4-Wire USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM-PDK Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Kits.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: Is the cutoff frequency of the product For-Use-With?
Q: Yes, the product's For-Use-With is indeed USB-MODEVM
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is -.
A: What is the Interface of the product?
Q: The Interface of the product is I2C.
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed -
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Touch Screen.
A: At what frequency does the Sensing-Range?
Q: The product Sensing-Range is -.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed 2 Boards
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TSC2007
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2007
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is 4-Wire USB.