| Mfr. #: | TSC2046EVM |
|---|---|
| 製造商: | Texas Instruments |
| 描述: | Sensor Development Tools Touch Sensor Development Tools TSC2046 Eval Mod |
| 生命週期: | 製造商新產品 |
| 數據表: | TSC2046EVM 數據表 |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, SPI Interface IC package type: TSC2046 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2046.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2046EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Resistive Touch Sensors.
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Interface, Touch Screen Controller.
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is 4-Wire Resistive Touch Screen Controller, SPI Interface.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TSC2046.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3.3 V.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is TSC2046.