XIO2001EVM

Mfr. #: XIO2001EVM
製造商: Texas Instruments
描述: EVAL MODULE FOR XIO2001
生命週期: 製造商新產品
數據表: XIO2001EVM 數據表
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
XIO2001EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: PCI Express to PCI Bulk is the packaging method for this product The Interface, PCI to PCI Bridge is the Main-Purpose. Primary-Attributes: - IC package type: XIO2001 This product operates at a 3.3 V 5 V 12 V supply voltage for reliable performance. This product is an XIO2001 - Interface,PCI to PCI Bridge Evaluation Board. This tool is designed for the XIO2001. PCI interface type

XIO2001EVM Image

XIO2001EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

XIO2001EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type PCI Express to PCI
  • Packaging Bulk
  • Main-Purpose Interface, PCI to PCI Bridge
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part XIO2001
  • Operating-Supply-Voltage 3.3 V 5 V 12 V
  • Description-Function XIO2001 - Interface,PCI to PCI Bridge Evaluation Board
  • Tool-Is-For-Evaluation-Of XIO2001
  • Interface-Type PCI

XIO2001EVM

XIO2001EVM Specifications

XIO2001EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is PCI Express to PCI.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, PCI to PCI Bridge.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed XIO2001

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V 5 V 12 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is XIO2001 - Interface,PCI to PCI Bridge Evaluation Board.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is XIO2001.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is PCI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
數量
單價
小計金額
1
US$346.20
US$346.20
10
US$328.89
US$3 288.90
100
US$311.58
US$31 158.00
500
US$294.27
US$147 135.00
1000
US$276.96
US$276 960.00
Top